Cencyble Mines-Telecom Institute / Studio 02 Architectes

Cencyble Mines-Telecom Institute / Studio 02 Architectes - Table, Windows, ChairCencyble Mines-Telecom Institute / Studio 02 Architectes - Exterior Photography, Windows, FacadeCencyble Mines-Telecom Institute / Studio 02 Architectes - Exterior Photography, WindowsCencyble Mines-Telecom Institute / Studio 02 Architectes - WindowsCencyble Mines-Telecom Institute / Studio 02 Architectes - More Images+ 17

Cesson-Sévigné, France
  • Area Area of this architecture project Area:  740
  • Year Completion year of this architecture project Year:  2021
  • Photographs
    Photographs:Luc Boegly
  • Manufacturers Brands with products used in this architecture project
    Manufacturers:  GRAPHISOFT, Arcelor Mittal, Siepel
More SpecsLess Specs
Cencyble Mines-Telecom Institute / Studio 02 Architectes - Exterior Photography, Windows, Facade
© Luc Boegly

Text description provided by the architects. The Institut Mines & Telecom of Loire Atlantique is erecting a new «Cencyble» building at the heart of its engineering campus, dedicated to teaching, research, and cyber security. The site of the ITM, made up of several buildings dating from different periods of construction, is part of a strong landscape, with rugged topography and remarkable trees.

Cencyble Mines-Telecom Institute / Studio 02 Architectes - Exterior Photography, Windows, Facade
© Luc Boegly

The new building is located at the intersection of this landscape and the inner courtyard. This posture ensures a strong identity and visibility in relation to the urban environment. This newly created inner square becomes the articulation between the different buildings of the campus. It plays a unifying role, perceived as a space for exchange, like the Cencyble program, at the crossroads of training, research, and entrepreneurship.

Cencyble Mines-Telecom Institute / Studio 02 Architectes - Exterior Photography, Windows, Facade
© Luc Boegly
Cencyble Mines-Telecom Institute / Studio 02 Architectes - Exterior Photography, Windows, Facade
© Luc Boegly

The program extends over three floors: On the ground floor, access is done under a generous courtyard, a covered extension of the plot. From the main entrance hall, we can see the central core of the project, which includes all the common functions. Around, are distributed the LabFab and the practical workrooms, the large meeting room, the executive offices. The “Cyber CNI” Chair and the “HQ”, isolated, meet a confidentiality requirement and the strict access control measures imposed by such a research building.

Cencyble Mines-Telecom Institute / Studio 02 Architectes - Lighting, Windows
© Luc Boegly
Cencyble Mines-Telecom Institute / Studio 02 Architectes - Image 21 of 22
Plan
Cencyble Mines-Telecom Institute / Studio 02 Architectes - Table, Windows, Chair
© Luc Boegly

As a new landmark identifiable at first sight, Cencyble reveals a sober, dark, and slender volumetry. The facades are encased in corrugated metal cladding, alternating solid and perforated surfaces. Translating these notions of protection, the garment offers a porosity that contrasts with the rigor of the square volume. Wide openings and loggias offer outdoor spaces and distant views without impacting the original volume.

Cencyble Mines-Telecom Institute / Studio 02 Architectes - Windows
© Luc Boegly

Project gallery

See allShow less

Project location

Address:35510 Cesson-Sévigné, France

Click to open map
Location to be used only as a reference. It could indicate city/country but not exact address.
About this office
Cite: "Cencyble Mines-Telecom Institute / Studio 02 Architectes" 26 Feb 2022. ArchDaily. Accessed . <https://www.archdaily.com/977151/cencyble-mines-telecom-institute-studio-02-architectes> ISSN 0719-8884

You've started following your first account!

Did you know?

You'll now receive updates based on what you follow! Personalize your stream and start following your favorite authors, offices and users.